It was in June 2014 when Christo and Vladimir YAVACHEV presented to Rosen JELIAZKOV their idea about ‘The Floating Piers’. The world acclaimed artist insisted that the pontoons must not deviate from their axis even in rough seas which required the creation of an innovative anchorage system. Rosen also shared his initial views about the concept and its implementation.
In the late summer of 2014 near Hamburg, Germany, in secret from the public, the first test of the facility modules was carried out. It was at that time when the final choices were made about the form of the cubes, the height of the pier and the coating materials. It was decided that ‘The Floating Piers’ would be implemented with self-produced and specifically designed for the purpose cubes with the needed size and shape.
In February 2015, detailed tests of the facility were conducted in open waters. The first test of the model for anchorage system was carried out in the Black Sea near Sozopol, Bulgaria. The results obtained from the simulations confirmed the high resistance of the structure in rough seas, the big loading capacity as well as its flawless operation. The visual effect of a platform floating on the water was achieved with an otherwise stable and well-anchored structure.